Mechanical & Electrical Fit-Out Design for Mental Health Wing, Hospital

Doherty Engineering completed a project involved with the conversion of an existing shell space, located on Level 0, to an operating warehouse environment. Doherty Engineering completed a commercial shelving system layout review, along with identifying specific requirements. All engineered modifications were code compliant. Design co-ordination between the existing HVAC system would remain “as-is”, with the additional shelving and operation in the area taking this into consideration. Avoiding conflicts between the shelf positioning and existing HVAC systems, as well as potential damages to existing systems from forklift operations.


Services Provided : Engineering Design, Code Review

Specialities : HVAC & Building Services

Size : 5,501.19 sq.m.

Building Type : Healthcare

Location : Toronto, ON, Canada