Canadian Forces Base
Steam and Condensate System Design, Canadian Forces Base

Doherty Engineering designed the steam and condensate connection of two buildings to their district energy system. Each project was an extension of their steam distribution system into new buildings that were being constructed on site. The projects involved redesigning the manholes to take new connections, designing the shallow inverted trench distribution system according to the[…]

Utilities and Infrastructure Master Plan, University

Doherty Engineering completed a multi-phased 30-year Utilities and Infrastructure Master Plan for a university campus. Project objectives involved determining age and capabilities of existing equipment and infrastructure, development of a 30-year plan to replace aging assets and infrastructure, meet the needs of a developing campus, remedy existing issues and bottlenecks, improve the redundancy and resiliency[…]

Mechanical & Electrical Fit-Out Design for Mental Health Wing, Hospital

Doherty Engineering completed a project involved with the conversion of an existing shell space, located on Level 0, to an operating warehouse environment. Doherty Engineering completed a commercial shelving system layout review, along with identifying specific requirements. All engineered modifications were code compliant. Design co-ordination between the existing HVAC system would remain “as-is”, with the[…]

1